A cost-effective testing programme is essential in the design of switchgear. The order of testing is vital to ensure cost effectiveness. Tests must be performed at key stages to prevent excess spend continuing on underperforming designs. However, passing all tests is not always cost effective either as the design may be over engineered if the performance limits are not known. A well planned and executed test regime is essential for cost effectiveness of both project and final product.